Fine tuning.         
Day 2. Railroad Construction Co. workers use a jack and the loading dock for leverage to try and slide the rail forward and close the gap. You can see how much they need to move just left of the #6543 operator. Canon PowerShot S5 IS:6.0-72.0mm built-in lens @ 6mm:f2.7:1/20:AUTO:ISO800. Post processing - cropping and color correction.
Date: 1/20/2015 Location: North Brunswick, NJ   Map Show North Brunswick on a rail map Views: 124 Collection Of:   John Wolan
Author:  John Wolan
Fine tuning.
Picture Categories: Track This picture is part of album:  Silver Line Tie Replacement and Track Maintenance
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4103202