Day 2. Railroad Construction Co. worker speeds along back to the entrance on #6543 equipment. Canon PowerShot S5 IS:6.0-72.0mm built-in lens @ 10.2mm:f2.7:1/30:AUTO:ISO800. Post processing - cropping and color correction. |
Date:
1/20/2015 |
Location:
North Brunswick, NJ Map  |
Views:
141 |
Collection Of:

John Wolan |
|
Author: John Wolan
|
 |
Picture Categories: Track |
This picture is part of album: Silver Line Tie Replacement and Track Maintenance |